Why one sheet

  • A 10–15% contingency line is pre-added — NARI and RSMeans 2026 treat it as standard practice for US renovations.
  • Structural, electrical, plumbing, and HVAC work almost always need a permit; track each trade so nothing is missed at inspection.
  • Printing keeps budget and permits together in the job binder, where they belong.

Renovation Budget & Permit Checklist

Budget Lines

Line item Estimated ($) Actual ($) Difference ($) Remove
$0
$0
$0
$0
Total $0 $0 $0

Permit Checklist (by trade)

Trade / Scope Required Permit # Applied Approved Inspected
Structural / Framing
Electrical
Plumbing
HVAC / Mechanical
Addition / Square footage
Window / Door (egress)
Roofing
Demolition (structural)
Final inspection

Structural, electrical, plumbing, HVAC, and most additions usually require a permit; cosmetic work typically does not. Local rules vary — confirm with your building department. Keep the Contingency (10-15%) line funded; RSMeans 2026 and NARI treat that reserve as standard for US renovation projects.

How to use this checklist

  1. Fill the header. Project name, property, contractor, and date print at the top of the sheet.
  2. Enter budget lines. List each line item with an estimated and actual amount. The Difference column and totals update as you type.
  3. Keep contingency funded. The 10–15% contingency line is pre-added; for pre-1990 homes plan 20–25%.
  4. Track permits. Mark each trade as required, then record the permit number and its applied / approved / inspected status.
  5. Print the sheet. Click Print for a Letter-size page showing only the checklist, ready for the job binder.

Renovation budget / permit checklist FAQ

A one-page printable sheet that combines your renovation budget lines (estimated and actual) with a permit tracker for each trade — structural, electrical, plumbing, HVAC, and more. Print it for the job binder so budget and permits live in one place.

Structural, electrical, plumbing, HVAC, and most additions almost always require a permit; cosmetic work like paint or flooring usually does not. Local rules vary, so confirm with your building department. The checklist marks each trade so you can record whether a permit is required and its status.

Fill in the project header, budget lines, and permit statuses, then click Print. The print view shows only the sheet on Letter (8.5 x 11 in) paper — navigation and buttons are hidden — so you get a clean working copy.

Important Disclaimer (YMYL)

This checklist is a planning aid only — not financial, legal, or professional advice. You enter all budget and permit details yourself; the tool only provides the template and math. Permit requirements vary by jurisdiction and change over time. Always confirm with your local building department and licensed contractors and lenders before committing to a budget or starting work.